Key takeaway
The cheapest time to fix a misplaced drain or unsupported fitting is before the concrete is poured.
Safety and jurisdiction
Educational overview, not a site-specific installation plan. Use a qualified, appropriately licensed contractor and required permits. Never enter an unprotected excavation, cut structural framing or a slab without clearance, or conceal piping before the required inspection. Existing slabs may contain post-tension cables, electrical services or embedded piping; cutting without investigation can cause serious injury.
Codes and permit rules vary by city and change over time. Confirm requirements with your local building department and a licensed contractor.
01Set fixtures from finished dimensions
Start with the final floor plan, not a rough sketch of the room. Toilet rough-in, shower drain location, wall thickness and cabinet clearances all depend on the finished surfaces and the selected fixtures. Account for tile, backer board and the actual flange or drain assembly.
A change from a tub to a shower, or moving a toilet a few feet, can change branch sizing, venting and elevation requirements. Resolve those changes on the approved plan before rough-in rather than trying to make a fitting compensate during the pour.
02Coordinate structure, bedding and pipe protection
Drainage needs consistent bedding and a uniform approved slope. A fitting suspended over an uneven trench can settle or crack once concrete and soil loads arrive. Keep debris and concrete out of open piping with appropriate temporary protection.
Do not run pipes through structural footings or cut reinforcement simply because the route is shorter. The structural design and inspector determine acceptable penetrations and protection. Sleeves or isolation at a penetration address movement and contact; they do not grant permission to alter the structure.
03Photograph and inspect while everything is visible
Before concealment, ask the contractor to document the drain route, branch connections, vent takeoffs and cleanout access. Include reference measurements to fixed walls so the pictures remain useful after the slab hides the piping.
The required rough plumbing test and inspection must happen before the pour. For plastic drains, do not substitute a compressed-air test for an approved water test. Test plugs must be selected and restrained by trained personnel; a plug can release suddenly under load.
- Fixture positions checked against finished walls
- Grade and bedding verified along the entire route
- Structural penetrations approved
- Required test and inspection accepted before concealment
Sources and further reading
- 2025 California Plumbing Code — chapter directory (opens in new tab)Code reference, not a substitute for the edition and amendments applicable to your permit. Detailed sections may require an account.
- City of Irvine — Building Codes and Standards (opens in new tab)2025 standards apply to new plan review applications from January 1, 2026; local amendments matter, particularly for underground piping.
- Charlotte Pipe — The dangers of air testing PVC, CPVC and ABS (opens in new tab)Manufacturer safety guidance and a 10-foot water-head testing example. Never transfer a gas test pressure to a plastic drain system.